
Chapter 2: Installation CLS200 Series User’s Guide
18 Watlow Anafaze Doc.# 0600-3050-2000
Mounting with Standoffs
1. Remove the DIN rail mounting brackets from the
TB50.
2. Select a location with enough clearance to remove the
TB50, its SCSI cable and the controller itself.
3. Mark the four mounting holes.
4. Drill and tap four mounting holes for #6 (3.5 mm)
screws or bolts.
5. Mount the TB50 with four screws.
There are four smaller holes on the terminal board. Use
these holes to secure wiring to the terminal block with tie
wraps.
Figure 2.9 Mounting a TB50 with Standoffs
Mounting the Power Supply
If you use your own power supply for the CLS200, refer to
the power supply manufacturer’s instructions for mounting
information. Choose a Class 2 power supply that supplies
an isolated regulated 12 to 24V
Î (dc) at 1 A.
3.4 in
(86 mm)
3.6 in
(91 mm)
2.6 in
(66 mm)
(18 mm)
0.2 in
(5 mm)
0.2 in
(5 mm)
SCSI Connector
0.2 in
4 holes for
0.7 in
(5 mm)
#6 (3.5 mm)
screws or bolts
Comentarios a estos manuales